PROJECTS

We are excited to share the following projects being worked on in 2016:

Alvin High School No .3 – Pearland, Texas New three-story 470,000 SF high school for Alvin Independent School District. This high school campus will house approximately 2,500 students. This project starts with a three story open concept student union and entry and then continues with associated classrooms, cafeteria, administration offices, library, college career resource center, science labs, culinary lab, weight room, performing arts center, drama room, animal science / wildlife classroom, horticulture and landscape classroom, medical clinic, band hall and practice rooms, choir lab, practice and competition gymnasiums and locker rooms, football field and press box, soccer field, track and field, tennis courts, baseball and softball fields. This project will be completed in 24 months.

Shadow Creek High School Natatorium – Pearland, Texas New one-story 20,000 SF natatorium for Alvin Independent School District. This natatorium includes a seven lane competition pool with 155 fixed seating, locker rooms and offices.

Katy Elementary Schools No. 38 and No. 39 – Katy, Texas Two new elementary schools with gym, library, cafeteria, kitchen, music rooms, tech labs, media center, art rooms, clinic, volunteer center, special ed classrooms, classroom and administrative offices.

Episcopal High School Athletic Addition – Bellaire, Texas New three story  67,000 SF athletic complex for Episcopal High School. The first floor will include a lobby, restrooms, 1500 seat field house, locker rooms and showers and training rooms.  The second floor will have a weight room/fitness center, wrestling and cheerleading practice area, storage and office areas.  The third floor includes a trustees meeting room and a catering kitchen.

Alvin CTE Phase 2 – Manvel, Texas New two story 146,250 and 15,375 of existing building fore new career and technical education high school campus on two sites for Alvin ISD to serve approximately 800 students.  Site one provides site detention and site two previously served as a middle school campus.  Work for site two provides a new two story building connected to one existing building to remain and be refurbished.

Alvin Elementary School No. 17 – Pearland, Texas New two story 102,000 sf elementary school for 800 students for grades Pre-K thru 5th grade.  Consisting of classrooms, music classrooms, kitchen and cafeteria, gymnasium, library, science labs and administrative offices.

Alvin Elementary School No. 18 – Manvel, Texas New one story 96,000 sf elementary school for 800 students for grades Pre-K thru 5th grade.  Consisting of classrooms, music classrooms, kitchen and cafeteria, gymnasium, library, science labs and administrative offices.  This project is a repeat of Bill Hasse Elementary that Gamma has previously completed.

Frank’s Lafayette Office - Lafayette, Louisiana This is a negotiated project that consists of a new 5-story, 180,000 sf administration office in Lafayette, Louisiana.  Gamma will construct the new 5-story office building in phase 1 and once completed will demo the existing 3-story building as well as all paving and a miscellaneous 1-story building. The facility will be in operation while construction is being completed.


Dickinson ISD Educational Village – League City, Texas New 219,000  square foot, two story building serving 1,400 students in elementary and middle school on a 50 acre site.  It consists of a new elementary school and a new middle school but sharing common areas.  The schools will incorporate classrooms, science labs, cafeterias with stages, library, kitchen, music, band and drama rooms, art rooms, administrative offices, clinic and 2 gymnasiums and covered play areas.

Kelsey-Seybold Flagship Main Campus Renovations – Houston, Texas The 2015-2016 renovations to the Kelsey-Seybold’s flagship Main Campus will include a completed renovation of the Ambulatory Surgery Center and Endoscopy Center, a new cardiology lab and nuclear medicine suite, expansions to the pharmacy and laboratory, and build out of CT diagnostic space.  This project will also open up the waiting area on the first floor, allowing natural light to flow into the area.

With this project, Gamma Construction will have renovated a significant portion of the Main Campus.  Earlier projects included renovations in the following departments:  Dermatology; Allergy; Urology; Pulmonology; Research Foundation; Administration; and IV Therapy.

Kelsey-Seybold Clinic Katy – Katy, Texas New two-story 36,400 SF Medical Office for the nation's first accountable care organization certified by NCQA, located on Westpark Tollway and the Grand Parkway near Katy, Texas.  Designed to house 16 physicians in family medicine, internal medicine, pediatrics, orthopedics, dermatology and other specialties.  Includes a pharmacy, clinical laboratory, two x-ray rooms, and space for additional ancillary services.  The front entry will feature an open two-story rotunda area, and the wait areas will feature an abundance of natural light.  Gamma is scheduled to complete this project in nine months on a construction manager at risk basis.

Upon completion of this project, Gamma will have delivered 350,000 sf of new medical office space to Kelsey-Seybold over a two-year period.

Lamar CISD Elementary School No. 24 – Richmond, Texas New one story, 96,800 square foot elementary school with classrooms, administrative offices, fine arts, gymnasium, playground and cafeteria.


Alvin ISD Bill Hasse Elementary School – Alvin, Texas This project will be a new 96,000 square foot, one story building replacement school for 800 students in Pre K thru 5th grade.  It consists of new classrooms, science labs, cafeteria with stage, library, kitchen, music room, administrative offices, clinic and gym.

Kelsey-Seybold Clinic Sienna Plantation – Missouri City, Texas New 23,800 SF Medical Office for the nation's first accountable care organization certified by NCQA, located near the Sienna Plantation and Riverstone communities. The one-story clinic, scheduled to open in August of 2016, will be located at 7010 Highway 6, Missouri City, near the Oilfield Road/Lake Olympia Parkway intersection.  Kelsey-Seybold Clinic – Sienna Plantation will offer services in eight medical specialties and accommodate 12 physicians and their staff. In addition to medical services, patients will have the convenience of onsite pharmacy, lab, X-ray and diagnostics.

Schomp Mini Cooper / Honda – Highland Ranch, Colorado New 141,000 SF Mini Cooper / Honda dealership including site improvement amenities, car wash and 8 acres of paving.

Studemont Junction – Houston, Texas New two story, 44,000 square foot building shell for future clinic for Memorial Hermann.