PROJECTS

 

We are excited to share the following projects being worked on in 2015:

New Caney ISD 2012 Bond Projects – New Caney, Texas. This is a CM at Risk process for the bond program at New Caney ISD.  The bond will be voted on in May of this year.  It is to include a new middle school, new elementary school, new and renovations to stadium, additions and renovations to New Caney High School and the Annex, classroom additions to four existing elementary schools, renovate and expand the existing Ag Barn to become an educational Agriculture Science Center, additions and renovations to Keefer Crossing Middle School, various kitchen, electrical and roofing updates, renovations to the 6th Grade Campus, expand the Child Nutrition Warehouse and add additional bus parking spaces at the Transportation Department.  

Alvin High School No .3 – Pearland, Texas New three-story 470,000 SF high school for Alvin Independent School District.  This high school campus will house approximately 2,500 students.   This project starts with a three story open concept student union and entry and then continues with associated classrooms, cafeteria, administration offices, library, college career resource center, science labs, culinary lab, weight room, performing arts center, drama room, animal science / wildlife classroom, horticulture and landscape classroom, medical clinic, band hall and practice rooms, choir lab, practice and competition gymnasiums and locker rooms, football field and press box, soccer field, track and field, tennis courts, baseball and softball fields.    This project will be completed in 24 months.

 

Lamar CISD New District Natatorium – Rosenberg, Texas New 32,000 square foot natatorium with pool, home and visitor locker rooms, bleachers, classrooms, offices, lifeguard training room, concessions and laundry rooms.   

Doggett JD Industrial Equipment, Houston, Texas – This project consists of a new service shop and sales addition.  It also consists of a renovated existing pre-engineered building that contains office space, multi-purpose rooms, locker rooms and parts storage.  

Frank’s Lafayette Office - Lafayette, Louisiana This is a negotiated project that consists of a new 5-story, 180,000 sf administration office in Lafayette, Louisiana.  Gamma will construct the new 5-story office building in phase 1 and once completed will demo the existing 3-story building as well as all paving and a miscellaneous 1-story building. The facility will be in operation while construction is being completed.

Kelsey-Seybold Clinic Katy – Katy, Texas New two-story 36,400 SF Medical Office for the nation's first accountable care organization certified by NCQA, located on Westpark Tollway and the Grand Parkway near Katy, Texas.  Designed to house 16 physicians in family medicine, internal medicine, pediatrics, orthopedics, dermatology and other specialties.  Includes a pharmacy, clinical laboratory, two x-ray rooms, and space for additional ancillary services.  The front entry will feature an open two-story rotunda area, and the wait areas will feature an abundance of natural light.  Gamma is scheduled to complete this project in nine months on a construction manager at risk basis.

Upon completion of this project, Gamma will have delivered 350,000 sf of new medical office space to Kelsey-Seybold over a two-year period. 

New Caney ISD Tavola Elementary School – New Caney, Texas New 107,000 sf, one story elementary school with classrooms, library, cafeteria, administrative offices and nurses station.

Baywater Drilling – Houma, Louisiana  This building consists of a 25,435 SF single-story tilt-up concrete building with steel roof structure. This building will provide office spaces, training room, break room kitchen and living quarters for Baywater Drilling staff. The living quarters will be used for Baywater Drilling staff that are visiting Houma for a short 2-3 day stay maximum.

Alvin ISD Bill Hasse Elementary School – Alvin, Texas This project will be a new 96,000 square foot, one story building replacement school for 800 students in Pre K thru 5th grade.  It consists of new classrooms, science labs, cafeteria with stage, library, kitchen, music room, administrative offices, clinic and gym.

Dickinson ISD Educational Village – League City, Texas New 219,000  square foot, two story building serving 1,400 students in elementary and middle school on a 50 acre site.  It consists of a new elementary school and a new middle school but sharing common areas.  The schools will incorporate classrooms, science labs, cafeterias with stages, library, kitchen, music, band and drama rooms, art rooms, administrative offices, clinic and 2 gymnasiums and covered play areas.

City of Tomball Fire Station – Tomball, Texas New 12,000  square foot fire station with 6 apparatus bays, dorm rooms, day room, kitchen and pantries, day room, gear rooms, offices, EMS and weight room.

Alvin CTE Phase 1 – Manvel, Texas Renovation of existing gym space into auto shop for Alvin ISD.  This project has six auto lifts, one truck lift, paint spray booth and classrooms.

Cadence Bank Hughes Landing – The Woodlands, Texas New 5,300  square foot interior renovation of second generation space in existing shell building.

Frank’s International – Odessa, Texas This project consists of the construction of a new pre engineered metal building pipe manufacturing facility, office building and skybridge and associated site work.  The existing facility will remain under operation during construction and after completion of Phase 1 the existing building will be demolished.